Case Study: London to Corby

London to Corby

Case Study: Project Delivery

Client: Network Rail – London to Corby Key Output 1

Project Value – £260m

Programme: July 2019 – present

Contracting Model – PSA

Following our involvement in the development phase on the Midland Mainline upgrade prior to the project being paused, Axial is currently contracted to lead on construction integration for the project.  The outline scope consists of track modifications, structures and clearance works, routewide lineside civils, new electrification and power upgrades, signalling, telecoms and SCADA. Axial’s scope is to lead and co-ordinate the construction planning process and outputs from T-12 weeks through to delivery. To support this process we have supplied specialist Integration roles and our AxiPlan toolkit.

Roles Supplied

Integration Lead

Senior Construction Planner

What our client said

‘My dealings with the Axial team have always been positive and refreshing, no more so than during my role as the Managing Director of the Midland Mainline Electrification Programme for the Carillion Powerlines Joint Venture.

They managed with utmost professionalism the complexities of a £ 1.5 billion programme to upgrade the Midland Main between London and Sheffield with scope encompassing some 164km of new electrification, power supply upgrade, Telecomms and SCADA immunisation. This required liaison and interface management with Network Rail and their wider supply chain for disciplines including Track Remodelling, Route clearance, Line speed enhancement & Signalling Upgrades’.

I would wholeheartedly recommend Fin and the rest of the Axial team for any multi-disciplined Rail Project and would not hesitate to use them again’.

Martin Smith – Managing Director – CPL Powerlines JV